Cuff-Up Mittens
|
|
|
sizes: 2/3 yrs (circ. 5.5"/14cm), 4/5 yrs (circ. 6"/15.25 cm), 6/7 yrs (circ. 6.5"/16.5cm), 8 yrs/wm sm (circ. 7"/17.75cm)
|
|
materials & gauge:
approx 50 gm/100 yds worsted weight yarn (shown in Cascade 220 - band info: 4.5st/US 8 or 5st/US 7 needles)
if using 2 colors, approx 50 yds of second color
circular needles: 4.25mm (US 6) and 3.5 mm (US 4) or size necessary to achieve gauge
click for tips for adapting to double-points
gauge: 22 st/29 r = 4"/10 cm, in stockinette
|
|
DAY 1
CAST ON AND RIBBING
using smaller needles, cast on 24(28/28/32)st using a longtail or German twisted cast on to create a stretchier edge. place half the stitches on each needle and join to form a circle, being careful not to twist.
knit one round.
ribbing: k2, p2 around until cuff is 1½”(1¾”, 2”, 2¼”):(3.8cm/4.5cm/5.1 cm/
5.75cm) long, or to desired length.
|
|
DAY 2
LOWER HAND AND THUMB OPENING
incr round: transitioning to larger needles, *k6(7/7/8), m1. repeat from * around. FOR SIZE 6/7 ONLY, work one more incr round as follows: k8, m1, k16, m1, k to end of round. 28(32/34/36) st
Knit even until piece measures 1¼”(1½”, 1¾”, 2”):(3.2cm/3.8cm/4.5cm/5.1 cm) from ribbing, or to the base of the thumb.
right thumb: k across ndl 1. k 2, then k next 4 (5, 6, 6) sts with a piece of waste yarn.
Slip waste yarn sts back to LH ndl and knit again with working yarn.
k to end of round.
left thumb: k across ndl 1. k 8(9, 9, 10) sts, then k next 4 (5, 6, 6) sts with waste yarn.
Slip waste yarn sts back to LH ndl and knit again with working yarn.
k to end of the rnd.
|
|
DAY 3
UPPER HAND
Knit even until the mitten is 2½”(3¼”, 4”, 4½”):(6.4cm/8.3cm/10.2cm/11.5cm) from thumb opening, or 1¼”(1½”, 1¾”, 2”):(3.2cm/3.8cm/4.5cm/5.1 cm) less than desired length.
|
|
DAY 4
DECREASES
FOR SIZE 6/7 ONLY, begin by working one decrease round:
k6, k2tog, k14, k2tog, k to end of round. (32 st)
for all sizes, decease as follows:
• *k5(6/6/7), k2tog. repeat from * around. 24(28/28/32) st
• knit one round
• *k4(5/5/6), k2tog. repeat from* around. 20(24/24/28) st
• knit one round
begin decreasing every row, as established above, until 8 st remain.
clip yarn, leaving a 6“ tail. Draw tail through rem sts tightly. Thread yarn to inside and secure
|
|
DAY 5
THUMB AND FINISHING
Pick out waste yarn at thumb and place live sts onto 2 needles.
Pick up 2 additional st in each “corner” to close any gaps. 11(13, 15, 15) sts.
Knit around until thumb measures 1½”(1¾”, 2”, 2¼”):(3.8cm/4.5cm/5.1 cm/
5.75cm) above hand or ¼“ (1 cm) less than desired length.
K2tog around for 2 rnds or until 8 or fewer sts remain.
Cut yarn, leaving a 6“ tail. Draw tail through rem sts tightly. Thread yarn to inside and secure. Weave in all ends securely.
|
|
|
|
|
Pictures & Patterns ©2001-2031 p2 designs, all rights reserved
terms of use
The free patterns on this site have been specifically developed for use in charity work. The patterns and items made from them are NOT to be sold! They should NOT be used as teaching materials unless you are donating your time as the instructor.
You may provide a direct link to these patterns but may not copy them to your website. Hard copies may be made and shared ONLY if the copyright notice and disclaimer are visible.
Not sure where to donate them ... click here for some ideas https://www.p2designs.info/Links-CharityPatterns.htm
|
|